73-ACRE FINAL LANDFILL CLOSURE
PROJECT SCOPE
During the capping process, CBP had to disconnect and relocate the existing gas system and reinstall it as the cap sections were completed. Above the liner system sections were complete, CBP installed the soil cover layer, tack on berms, down drain piping and associated stormwater control features.
The completed cap sections were vegetated as the project progressed establishing a beautiful final closed project for our client, Greenville County.